Transforming Hourly Production Monitoring with Zoho Creator

25.11.26 11:07 AM - Comment(s) - By Traqmetrix

How Dailee Simplified Multi-Plant Production Monitoring with Zoho Creator

Introduction:

Managing production across multiple manufacturing plants requires more than simply recording the quantity produced. Production teams need timely information about every line, shift, production hour, downtime and efficiency so that operational decisions can be made while there is still time to respond.

Daily Fresh Fruits India Pvt. Ltd., operating under the brand name Dailee, manages 7 manufacturing plants and 15 production lines covering CSD, Hot Fill and Water production. Earlier, hourly production information was captured manually through paper, Excel and a public Zoho Forms link.


This created challenges around delayed visibility, inconsistent calculations, missing entries and difficulty comparing performance across plants and production lines.


To address these challenges, Dailee implemented an Hourly Production Monitoring application on Zoho Creator. The solution combines QR-based production capture, automated calculations, approval controls and management dashboards into one connected production monitoring process.


1. QR-Based Hourly Production Capture

The production process begins directly at the production line. A printed QR code is fixed on each production line. The operator uses the Zoho Creator mobile application to scan the QR code, and the system automatically prepares the production entry with information such as the plant, line, shift and hour slot.


Instead of repeatedly entering multiple fields for every hourly record, the operator mainly enters the actual production output, selects the SKU and provides downtime details when required. This reduces repetitive data entry and helps ensure that production information is recorded against the correct line and shift.


2. Automatic Target and Efficiency Calculation

Production efficiency should not depend on manual spreadsheet calculations. When the operator selects the SKU, the system retrieves the corresponding rated speed from the Line-SKU Speed Master.


Once actual production is entered, the system calculates the relevant efficiency directly on the same screen. This gives the operator immediate visibility into how the production hour performed against the expected output. By moving the calculation into the application, Dailee can maintain a consistent approach to production measurement across its plants and lines.


3. Downtime and Loss Reason Capture

Production quantity alone does not explain why a line performed below target. When an hourly production target is not achieved, the operator can enter downtime minutes along with the reason for the loss. This information becomes part of the production record instead of being maintained separately. The collected downtime information can then be analysed to identify the major causes of lost production.


4. Approval-Based Production Data

A production dashboard is only as useful as the data behind it. Dailee's application introduces an approval gate for production entries. Every record is classified as either Pending or Approved. Only approved production records contribute to the figures shown on the Group Dashboard. Pending entries are still displayed separately, allowing leadership to understand how much information is waiting for approval. This creates a clearer distinction between submitted information and verified production information.


5. Missing Hourly Entries Are Identified

Missing production records can easily become invisible when reporting is performed manually. Dailee's solution includes a scheduled check at the end of each production slot. If an expected hourly entry is missing, the system identifies it and can escalate the issue to the supervisor if it remains incomplete. This allows the production team to address missing information closer to the time it occurs rather than discovering gaps while preparing reports later.


6. One Dashboard for Multiple Plants and Lines

With 7 manufacturing plants and 15 production lines, management needs a consolidated view of production performance.

The Group Dashboard brings production information together and allows users to filter the data by:

  • Period
  • Process
  • Plant
  • Production Line
  • Shift

This allows leadership to move from an overall production view into specific plants, lines and shifts without manually combining multiple spreadsheets.


7. KPI Cards for Production Performance

The dashboard provides multiple KPI views to help management understand production performance.

  • Achievement
  • Production against Target
  • Mechanical Efficiency
  • Single Line Efficiency
  • Asset Utilisation
  • Production Loss
  • Incentive Efficiency

KPI cards use threshold-based indicators so that areas requiring attention can be identified quickly.

The dashboard also provides trend comparisons for selected lines, including today's performance against yesterday and month-to-date performance against the corresponding period.


8. Hour-by-Hour Actual vs Rated Production

Daily production totals can hide problems that happened during individual hours. The Hourly Actual vs Rated chart provides an hour-by-hour comparison between actual production and the rated output. This gives supervisors and leadership a clearer view of where production moved above or below the expected rate during the selected day or shift.


9. Downtime Analysis with Pareto View

Not every production loss has the same impact. The dashboard includes a Where Time Is Lost downtime Pareto that groups loss categories so that the largest causes of downtime can be identified quickly. This helps shift the discussion from simply asking how much production was lost to understanding where the lost production came from.


10. Data Completeness for Better Decision-Making

A production number without complete supporting data can create a misleading picture. Dailee's dashboard therefore includes a Data Completeness measure that compares approved entries against the expected hourly slots. This allows leadership to understand not only what the production numbers say, but also how complete the underlying production records are.


11. What Dailee's Production Monitoring System Brings Together

The solution connects multiple parts of the production reporting process into one workflow:


                                Scan → Capture → Validate → Approve → Calculate → Monitor


Instead of relying on disconnected paper records, spreadsheets and manual calculations, production information is captured closer to the shop floor and made available through a centralised monitoring application.


The case study also establishes a foundation for measuring improvements in reporting time, data completeness, management awareness, production efficiency and downtime after validated client results are available.


12. From Manual Production Records to Connected Production Visibility

Dailee's production monitoring journey demonstrates how a manufacturing organisation can move beyond simply digitising forms.

The real value comes from connecting production capture with validation, approval, automated calculations, missing-entry detection, downtime analysis and management dashboards.


With Zoho Creator, the production team can capture information closer to the production line while management receives a structured view of performance across plants, lines and shifts.


For manufacturers managing multiple production locations, the goal is not just to collect more data. It is to make the right production information available at the right time.


Traqmetrix

Traqmetrix

Traqmetrix Solutions LLP
http://www.traqmetrix.com/
Share -